PEMB supplied and Installed nearly 100,000 sqft of structures for the Washington State Department of Natural Resources and the Department of Corrections in this joint venture project. Project was certified as a LEED’s Silver when complete. Buildings were comprised of VP Buildings structural members and SSR standing seam roof in galvalume with AEP Span horizontal wall panels in Forest Green. During project installation the local area broke a long standing record for rainfall duration of over 45 days.
We have worked closely with the Grain Storage and Ethanol Production industries to develop economical and functional designs for a wide range of uses. From truck and train loading and off loading facilities to surrounding elevated platforms with secondary structural and sheeting, PEMB has provided and installed structures all across the western U.S.
PEMB designed, supplied and installed the structure to enclose the turbines and generators for this Hydroelectric facility in Twin Falls. The finish floor elevation of this structure was some 30’ above the turbines and required the erection crews to erect the building suspended in the air without the use of a floor slab.
Project consisted of 10 Pre-engineered Metal Buildings and 2 Elevated Control Towers.
Bellevue Idaho
This project won the Best of Storage Category in VP’s Hall of Fame Awards.
Wheeled Vehicle Drivers Course, Fort Leonard Wood Missouri
Glanbia Foods Truck Wash Facility, Twin Falls Idaho
Kalama Wheat Cleaning Facility, Kalama Washington
Kuna Waste Water Treatment Facility, Kuna Idaho
North West Detention Facility, Seattle Washington
North Seattle Operations Center, Bellevue Washington